Contractor: National Directorate of Civil Aeronautics

Project: Consulting Services for the Development of Airport Infrastructure Expansion - AISP. Total area: 36,967 m2.

Contract amount: Gs. 1.503.500.000

Period: 2012

Description of the consultancy:

  • Collection and analysis of Background, Development of the Draft, Development of Plans and Documents of the Executive Project
In the Project Development stage:
  • Diseño arquitectónico detallado;
  • Structural and facilities design;
  • General technical-artistic, descriptive and justification report;
  • Technical specifications;
  • Metric and budget calculation form;
  • Scope and description of the works; Y,
  • General data necessary for the preparation of the specifications and conditions corresponding to the call for construction of the works.

FIRST STAGE
Area = 1,598 m2.
Surface to refunctionalize = 1,824 m2.
Concrete volume = 2,040.67 m3.
Foundations = Shoes and Tubulones.

SECOND STAGE
Area = 12,166 m2.
Surface to refunctionalize = 1,459 m2.
Concrete volume = 2,760 m3.
Foundations = Shoes, Plateas and Tubulones

THIRD STAGE
Area = 2,579 m2.
Surface to refunctionalize = 17,341 m2.
Concrete volume = 1,045.55 m3
Foundations = Shoes, Tubulones and Plateas